Kamoa-Kakula produced record 103,786 tonnes of copper in Q2 - Ivanhoe Mines

Kitco Media
By Vladimir Basov
Published
Updated
Kitco News
The Leading News Source in Precious Metals

Kitco NEWS has a diverse team of journalists reporting on the economy, stock markets, commodities, cryptocurrencies, mining and metals with accuracy and objectivity. Our goal is to help people make informed market decisions through in-depth reporting, daily market roundups, interviews with prominent industry figures, comprehensive coverage (often exclusive) of important industry events and analyses of market-affecting developments.

Editor noteGet all the essential market news and expert opinions in one place with our daily newsletter. Receive a comprehensive recap of the day's top stories directly to your inbox. Sign up here!

(Kitco News) - Ivanhoe Mines (TSX: IVN) (OTCQX: IVPAF) announced today that the Kamoa-Kakula copper complex in the Democratic Republic of Congo (DRC) produced a record 103,786 tonnes of copper in concentrate during the second quarter of 2023.

The company said Kamoa-Kakula milled a record 2.2 million tonnes of ore during the quarter at an average grade of 5.2% copper, adding that the record quarterly production was achieved despite maintenance shutdowns in June and intermittent grid instability.

According to a news release, the second quarter brings Kamoa-Kakula's year-to-date production to 197,389 tonnes of copper in concentrate, which includes the ramp-up of the debottlenecking initiatives since February 2023.

Ivanhoe pointed out that the 2023 annual production guidance for Kamoa-Kakula is maintained at between 390,000 to 430,000 tonnes of copper in concentrate.

Importantly, the company said that Kamoa-Kakula's Phase 3 expansion, consisting of two new underground mines known as Kamoa 1 and Kamoa 2 and a new, 5-million-tonne-per-annum concentrator plant, is well on track for first production in the fourth quarter of 2024.

More importantly, Ivanhoe also reported that construction of the smelter plant is now approximately 18% complete and the overall project progress is at 52%.

The 500,000 tonnes-per-annum copper smelter, which will be the largest in Africa and one of the largest in the world, is on target for starting production in the fourth quarter of 2024, it added.

Upon commencement of Phase 3 production, Kamoa-Kakula will have a processing capacity in excess of 14 million tonnes per annum. In the first five years of Phase 3 (2025 to 2029), copper production from the combined Kamoa-Kakula copper complex is expected to average approximately 650,000 tonnes per annum, at a cash cost (C1) of $1.15/lb.

“This production rate will position the Kamoa-Kakula Copper Complex as the fourth-largest copper mining operation in the world,” the company said.

Ivanhoe also noted that the project's phased expansion scenario to 19 Mtpa would position Kamoa-Kakula as the world's second-largest copper mining complex, with peak annual copper production of more than 800,000 tonnes.

The Kamoa-Kakula mining complex is operated by Kamoa Copper, a joint venture between Ivanhoe Mines (39.6%), Zijin Mining Group (39.6%), Crystal River Global (0.8%) and the DRC government (20%).


Peru's mining sector expands in May as copper production up 36%

Kitco Media

Vladimir Basov

Vladimir (PhD, MEng in Mining) is a professional mining engineer, scientist and analyst that has more than 20 years of practical in-field and research experience. He is particularly interested in collecting, processing baseline data and writing insightful data-driven mining industry analytics, articles, statistical and research reports.

Mdi Earth Logo

Share

Disclaimer: The views expressed in this article are those of the author and may not reflect those of Kitco Metals Inc. The author has made every effort to ensure accuracy of information provided; however, neither Kitco Metals Inc. nor the author can guarantee such accuracy. This article is strictly for informational purposes only. It is not a solicitation to make any exchange in commodities, securities or other financial instruments. Kitco Metals Inc. and the author of this article do not accept culpability for losses and/ or damages arising from the use of this publication.