Ocean miner The Metals Company (Nasdaq: TMC) said today that its production trial was a success.
A four-kilometer nodule collector lifted ore to the production vessel. The trial was held in the Clarion Clipperton Zone, located in the Pacific Ocean.
"During a 60-minute pilot collection run across ~150 meters of the seafloor, ~14 tonnes of nodules were collected by the pilot collector vehicle, transported to the surface using a 4.3-km riser system and placed into the hold of the surface production vessel Hidden Gem," wrote the company in a news release.
"In the first such test in the Clarion Clipperton Zone (CCZ) since the 1970s, the pilot trials show that the Allseas-designed nodule collection system can withstand the pressures and temperatures of its deep-sea operating environment."
